top of page
Tanner Health System Suite Renovation
Demolished existing partition walls, flooring, plumbing fixtures, and mill work in an office sweet. Constructed new metal stud partition walls, cabinets, upgraded lighting fixtures, installed new plumbing fixtures, upgraded fire alarm system, upgraded fire suppression system, installed new electrical outlets, installed audio visual systems, installed reception area with sliding glass pass through window, installed carpet tile, installed new ceiling grid and tile, sealed penetrations in fire wall, and painted throughout.
bottom of page